0000002867 00000 n The advantage of tubing-deployed system is better risk management. 0000005588 00000 n To bring context to the performance the general reservoir properties of Pad 264-3 are: In comparison of Pad 264-3 properties to those of Pad 263-1, it is apparent that this reservoir, although thick, has slightly poorer quality. Terms & Policies. SURMONT –PHASE 2 CANADA OIL TREATING FACILITY Capacity 90,000 BBL/D (3 X 30,000 BBL/D) Scope of Supply Free Water Knockouts (3 x 15’ ID X 133’ S/S) Mechanical Treaters (6 x 14’ ID X 82’ S/S) Services Engineering & Design Procurement Fabrication Year 2013 Project: 2.XX.13 - CPS SURMONT. It is indeterminate whether liner-deployed systems in SAGD producers are more effective than tubing-deployed. 0000018100 00000 n By continuing to browse you agree to our use of cookies. Surmont Lodge. The steam-assisted gravity drainage (SAGD) facility averaged 118,000 bbl/day in 2017, but capacity has been expanded to 150,000 bbl/day due to continuous improvement projects. V surmonté d'un point et accompagné d'un "E" : débit expiré. We use them to give you the best experience. Surmont Phase 2 Oil Sands project involved the expansion of the Surmont steam-assisted gravity drainage (SAGD) plant to increase its production capacity from the existing 27,000 barrels of bitumen a day to 136,000 barrels of bitumen a day. 4D Seismic (Figure 12), shows likely coalescence between Pad 263-1 and its southern neighbour Pad 264-1.   The steam-assisted gravity drainage (SAGD) facility averaged 118,000 bbl/day in 2017, but capacity has been expanded to 150,000 bbl/day due to continuous improvement projects. © Glacier RIG Ltd., all rights reserved. Aggregate bitumen production is about 1,500 m3/d with an SOR of about 3.5 (Figure 13). Join NrgEdge and view the full information about this project. Conformance alone is not the best measure of FCD performance. Client: ConocoPhillips Type: Mechanical, Piping, Electrical, Instrumentation, Structural Fabrication, Start-up and Commissioning, and Maintenance. 2 shows ERCB development area within the Surmont Lease. Pad 264-3 Surmont Phase 2 The deployment of FCDs on Pad 264-3 is almost identical to that of Pad 263-1. 3… BITUMEN PRODUCTION PROFILE & STEAM-TO-OIL RATIO (SOR) AT SURMONT . The Surmont leases consist of approximately 80 … Surmont SAGD Project. There is also some top water and a gas zone overlaying the reservoir in this pad. Translations in context of "surmont" in French-English from Reverso Context: Faire l'éloge d'un commentaire Pierre Surmont 29/09/2017 2:21 Splendide tout simplement. PIPELINES. This pad also has a small amount of bottom water. ConocoPhillips launched the Surmont SAGD pilot project comprising two 350m-long well pairs in 1997, and made the first 3D seismic acquisition in 1998. AOC has also been a strong user of FCDs, and perhaps the only other operator besides Conoco that has deployed FCDs on liners in some injector wells. Harris Naseer, P.Eng., has been involved with oil and gas industry for over 22 years. Wildwood SAGD Project – Phase 1. WELLS IN SERVICE CONOCOPHILLIPS • SURMONT. Total et Conocophillips annoncent le lancement de la deuxième phase de développement du projet surmont SAGD au Canada. The performance of the 263-1 pad leads to some interesting observations, (Figure 9). Last Update: 2018-02-13 Usage Frequency: 1 Quality: Reference: Wikipedia. Interestingly, the closest “high” producer (well pair 11 on Pad 102S) is a non-FCD well. total-ep-canada.com l'issue des travaux de construction, qui débuteront en 2010, le projet permettra de porter la capacité de production de 27 000 à 110 000 barils de bitume par jour. Thus, the expected flow resistance rating or the pressure drop that was anticipated in the design stage is not often realized in actual operations. Fuel is available at the cardlock right outside the lodge entrance. Results in terms of key performance indicators suggest that both ways work where properly designed and executed, and where there is a real need. Surmont Canada. Enbridge to Provide Additional Facilities at Cheecham Terminal for Surmont Phase 2. The project involves the construction of a 21,463.28m3/day (135,000 barrels per day (BPD)) bitumen production facility on an 8,908ha of land. The Surmont Phase II project has a nameplate capacity of 118,000 barrels per day and is the largest SAGD production facility built in a single phase. 0000006337 00000 n Jérôme Surmont : Consultant Expert Paie. Copy link. At the moment, AOC has 17 FCD installations, Figure 15 from its in situ performance presentation: Figure 15: FCD Orientation Map -Source: Athabasca Oil Corporation, Annual Surmont SAGD Performance Review presentation to AER, 2018, Figure 16: Pad 5 Gamma and 4D Seismic -Source: Athabasca Oil Corporation, Annual Surmont SAGD Performance Review presentation to AER, 2018. This raises the question, if the overall thickness, porosity, saturation and permeability are better or comparable to Pad 103 presented above, then why is the 266-2 pad producing half the rate with the same number of wells? PHASE 3 - D.S.N. There are 7 other wells on this pad with both FCDs and ESPs and 5 of these FCDs are liner deployed, similar to well pair 07. There is also a minor presence of top gas over this pad, which leads us to believe that a conservative operating strategy may have been chosen. Figure 14: Surmont Phase 2 South Seismic Monitor -Source: Conoco Phillips, Annual Surmont SAGD Performance Review presentation to AER, 2018. That means we co-own the development, but the facility itself is staffed and run by ConocoPhillips Canada employees and contractors. Figure 10: Performance of Well pair 263-1-07 -Source: Conoco Phillips, Annual Surmont SAGD Performance Review presentation to AER, 2018. The first SAGD well with FCDs (well 06) is highlighted with a red box. Figure 8: Production performance of Pad 266-2 -Source: Conoco Phillips, Annual Surmont SAGD Performance Review presentation to AER, 2018. Surmont Phase 2 project details . As seen in Figure 2, the majority of FCDs at Surmont Phase 1 have been deployed on Pad 103 and Pad 102N. HOUSTON – ConocoPhillips (NYSE: COP) achieved a significant milestone at its Surmont oil sands project in Canada with the on-schedule start of first steam at phase 2 on May 29.. Surmont uses steam-assisted gravity drainage (SAGD) to recover the bitumen. Department of Radiation Oncology, Ghent University Hospital and Ghent University, Ghent, Belgium. No discussion of conformance can be meaningful if not translated into production results. Figure 6: Composite image - Source: Conoco Phillips, Annual Surmont SAGD Performance Review presentations to AER, 2017 through 2018. The reservoir properties of this pad are summarized below: The way the charts are represented in the D-54 AER presentations, it is hard to gauge precise production numbers, but they seem less than 2,000 m3/d for aggregate 12 well pairs, (Figure 8). Surmont Phase I began commercial oil production in October 2007 and Surmont Phase II began production in 2015. Phone 780.881.6429. Sables bitumineux au Canada : mise en production du projet surmont phase 2. ConocoPhillips Canada (COP) in a joint-venture with Total E&P Canada (TOT), is planning to construct the Surmont Phase 3 Oil Sands Development project in Alberta, Canada. World’s biggest offshore wind producer moves into hydrogen, Growing Forward Together: The Next-Gen Alberta Advantage, Suncor aims to advance mining technologies in the oilsands, Spending on global energy transition hits record $500 billion, An outright 'No': Biden's Day 1 Keystone XL kibosh bodes ill for Canada U.S. ties, TC Energy decarbonization response to Keystone setback unlikely to sway ESG investors, Cancelled Keystone XL pipeline expansion won't lessen oil dependency, experts say, Avoidance of “hot spots” and steam breakthrough, Improve reservoir conformance longitudinally along the wellbore, Thickness of net continuous Bbitumen (NCB) 31.14 m, Kh horizontal permeability, Kv vertical permeability, Thickness of net continuous bitumen (NCB) 42.80 m, Thickness of net continuous Bitumen (NCB) 42.99 m, Thickness of net continuous bitumen (NCB) 36.14 m, Thickness of net continuous bitumen (NCB) 37.51 m. He is a volunteer member of the CHOA editorial committee and has contributed cover articles for a number of issues for the CHOA Journal. For SAGD injectors, it appears that liner-deployed FCDs have not provided any significant advantage over steam splitters. surmontphase3.com Total acquired a 43.5% interest in the project in 2002 and increased it to 50% in 2005. oil, gas & chemicals. Devon has deployed inflow control devices on 5 producer wells of its Jackfish Project. Non Renouvelable, Pétrole. Supplementary saline water may be supplied via the existing S1/S2 saline water pipeline and well network infrastructure. Read full article . In May 2008, Bantrel was awarded front-end engineering activities (FEL-3). Hydrocarbons Technology is using cookies. A similar argument holds true for FCD retrofitting versus incorporating FCDs in design from day one. If you have ideas for how we can improve our services, we’d love to hear from you. Health-Related Quality of Life in KEYNOTE-010: a Phase II/III Study of Pembrolizumab Versus Docetaxel in Patients With Previously Treated Advanced, Programmed Death Ligand 1-Expressing NSCLC. The Surmont leases fall in the southern Athabasca region of Alberta, approximately 80 kilometres south of Fort McMurray, an area that has been extensively explored and developed for natural gas projects and oil resources. Production from Pad L5 (orange line) can be estimated as somewhere between 500 to 600 m3/d, with an SOR between 3.5 and 4.0. … It will be of interest to see results of 4D seismic monitoring of these five pads that have a significant number of FCDs. Site 914, Mod 5, Comp 3, RR2 Anzac, Alberta, T0P-1J0 surmontlodge@wiebe.construction. Enbridge Inc announced today that it has entered into a terminal services agreement with ConocoPhillips Canada Resources Corp and Total E&P Canada Ltd. (the ConocoPhillips Surmont Partnership) to expand existing infrastructure at the Enbridge Cheecham Terminal to accommodate incremental bitumen production from Surmont's Phase 2 expansion. May 7, 2013, 1:49 PM. Surmont phase 2, Termokarstovoye, Gladstone LNG, Moho phase 1b, Vega Pleyade et Incahuasi ; -1,5% liés aux conditions de sûreté au Nigeria et au Yemen ainsi qu’aux incendies de forêts au Canada ; L’effet prix positif et l’effet périmètre ont compensé le déclin naturel des champs. 3. English. As governments and companies jostle to show how committed they are to fighting global warming, plans to take carbon dioxide out…, Danish utility Orsted A/S took a final investment decision on its first hydrogen project as it expands beyond wind power.…. He has been actively engaged in heavy oil and oilsands for more than 10 years and is considered one of the leading reservoir and production specialists in thermal recovery. The cost of these liner-deployed devices has also come down significantly to justify intensive use in conjunction with blank liner pipe. The first phase of Surmont began operations in 2007, while a second phase of expansion was brought online in 2015. Enbridge to Provide Additional Facilities at Cheecham Terminal for Surmont Phase 2. If you can’t find what you’re looking for or if you have any questions that are left unanswered in our web site, please feel free to contact us at info@surmontenergy.comfor more information. For all FCD equipped wells, adequate criteria must be established which must include oil production, water production, steam oil ratio, sub-cool, pressure drop, temperature distribution in the producer, and observation wells’ data. Figure 3: Composite image - Source: Conoco Phillips, Annual Surmont SAGD Performance Review presentations to AER, 2011 through 2018, Note: Well 5 on Pad 102N has been labeled as Well 6 and vice versa in some of the company presentations, Figure 4: 4D Seismic anomaly at different elevations -Source: Conoco Phillips, Annual Surmont SAGD Performance Review presentation to AER, 2015. Lean Construction; Virtual Design and Construction ; Capabilities/Services. However, most operators do not invest the time and capital in this effort. Three wells (CC1P, DD2P, and DD7P) have tubing-deployed devices, while two (RR2P and RR6P) have liner-deployed devices. E-facies are available at all the vertical wells. Pour une fréquence respiratoire de 12 inspirations à la minute. 0000000876 00000 n 0000004802 00000 n LIBRETTO-431: A Multicenter, Randomized, Open-Label, Phase 3 Trial Comparing Selpercatinib to Platinum-Based and Pemetrexed Therapy With or Without Pembrolizumab as Initial Treatment of Advanced or Metastatic RET Fusion-Positive Non-Small Cell Lung Cancer: Actual Study Start Date : February 17, 2020: Estimated Primary Completion Date : January 15, 2023: Estimated Study … He started his career with Schlumberger in 1996 and moved to exploration and production operations in 2004. Could that mean the performance of a pad is less dependent on the FCDs but on other factors that are not in the public domain and can only be speculated? The offsetting observation wells’ response, piezometric pressure and gamma-ray plots are presented in Figure 11 for context: Figure 11: Pad 263-1 Observation wells -Source: Conoco Phillips, Annual Surmont SAGD Performance Review presentation to AER, 2018. The 4D Seismic results show almost uniform longitudinal conformance over the entire pad, (Figure 14). Great people and staff. 3 surmont phase 2: managing construction of electric system: 22. civil government services mining & metals oil, gas & chemicals power. 0000012150 00000 n 4 0 obj <> endobj xref 4 29 0000000016 00000 n AER in situ performance presentations (2011 through 2018). 0000053540 00000 n L’objectif de démarrage de la production de Surmont Phase 2 a été fixé pour 2015 et devrait permettre de porter la capacité de production totale du champ à 130 kbep / j. Sur le projet Fort Hills (capacité de production estimée à 180 kb / j), la décision finale d’investissement a été prise en octobre 2013. The approximately $0.3 billion expansion is expected … Very understanding management and they lookout for their staff. 4 septembre 2015. The Surmont Project is a proposed multi-phased development with a total design capacity of approximately 120,000 bpd. Water production seems to indicate water retention in the reservoir for some time, and then in early 2018 water production increased by almost 50 percent, while steam injection rates were kept steady. The Surmont site is located approximately 63km south-east of Fort McMurray, Alberta, in the Athabasca oil sands region. 0000007174 00000 n How to use surmount in a sentence. mining & metals civil government services power 12. People commit to virtual events differently than in-person events. Surmont 2 Debottleneck Project • +40,000 bbl/day • TBD Surmont 3 • +135,000 bbl/day • TBD ... production from Surmont's Phase 2 expansion. 0000020278 00000 n Surprisingly, no significant difference in steam chamber conformance can be observed between non-FCD well pairs 04 and 05, and FCD well pair 06. 0000014041 00000 n This pad also has two experimental “fishbone” inline wells, which presumably is an effort to tackle the SOR challenges. If temperature measurements were available for deeper depths one could extrapolate that almost 10 m of reservoir below the producer elevation would be heated to 60 degrees C. If the temperature readings are correct this is unlikely to be the result of conductive heating alone. Job work-life … Surmont Lodge. French. Name * Last name * Company name Attivity * Other activity Address ZIP code City * Province * Phone E-Mail * Request * * Required fields I … It is a domain having com extension. Oilsands & Heavy Oil Termokarstovoye, Surmont phase 2, Moho Phase 1b, Gladstone LNG, et Vega Pléyade, -2% liés aux conditions de sûreté au Nigeria et au Yemen ainsi qu’aux incendies de forêts au Canada, +1% lié à l’effet prix positif et à la performance, net du déclin naturel des champs. There is some top water present over Pad 264-1 also. Share. Always learning new things at tailgate meetings and from management. Interestingly, even wells equipped with FCDs are being operated at a sub-cool of 10 degrees C by many operators. 4D seismic results are summarized on Figure 3 for Pad 102N. There was production improvement at the 2P1 producer immediately after ICD installation, whereas on 1P5 improvement was marginal. Design, supply, integrate all equipment and test 62 E-Houses for Conoco-Philips Surmont Project phase 2. From the D-54 reports, we cannot tell if this change was a function of reservoir, a change in operating strategy or some well completion event. However, in the 2016 presentation, Conoco reported another well on this pad (well pair 03) as an example of a “low” producer. Figure 7: Production performance of Pad 103 -Source: Conoco Phillips, Annual Surmont SAGD Performance Review presentation to AER, 2018. RETRAITE - D.S.N. 0000002529 00000 n Did You Know? SYNBIT PRODUCT SCO DILUENT; NAME. However, Pad 264-3 production performance is slightly worse than that of Pad 263-1. 0000012037 00000 n However, Pad 264-3 production performance is slightly worse than that of Pad 263-1. Building Revitalization; Financial/Insurance/Bonding Capacity surmontphase3.com is 5 years 6 months old. Delivery Methods; Technology & Innovation. The Surmont leases fall in the southern Athabasca region of Alberta, approximately 80 kilometres south of Fort McMurray, an area that has been extensively explored and developed for natural gas projects and oil resources. Commercial production from Surmont 1 began in 2007. This technique requires the reservoir to be heated with steam to allow the oil to flow. The initial pressure on this pad is lower (1337 kPa compared to 1691 kPa on Pad 103) which may have introduced injection pressure and rate constraints. Location map of the wells in the Surmont FPA color-coded by facies input source: e-facies only (purple), core (yellow), FMI facies (light blue) and both FMI and core facies (green). However the net pay on this pad is the thickest amongst all Phase 1 pads, and there could be other reservoir characteristics that contribute to this performance. Where adverse conditions, natural or self-inflicted, are insurmountable then neither will work. All rooms have fridges, flat screen TVs, complimentary guest laundry, quality bedding, and Wi-Fi. Via Cal Lusent, 71 31040 Pederobba (TV) - Italy Phone +39 0423 681981 Fax: +39 0423 681982 E-Mail: info@surmont.it. Surmont Lodge was an excellent camp to work for. In terms of reservoir quality and recovery factor (RF), Conoco reported the following data for Pad 102N: Pad 103 has similar reservoir characteristics to Pad 102N except pay thickness, as summarized below: Figure 6 shows 4D seismic anomaly plots for Pad 103, which show some coalescence with the nearby Pad 101N. Fig. Pad 264-3 Surmont Phase 2 The deployment of FCDs on Pad 264-3 is almost identical to that of Pad 263-1. The temperature is over 100 degrees C 8 m below the producer. Part II expands into a discussion of operator experience, and to what extent perceived benefits of the technology have materialized. SURMONT. If an operator has gained enough knowledge of the reservoir and all indications are towards more consistency and homogeneity in new wells, then liner-deployed systems will have the advantage of larger size and corresponding larger rates. This article is part of the Fall 2018 edition of the Journal of the Canadian Heavy Oil Association. Additional existing non … Longitudinal conformance seems slightly better in those well pairs equipped with FCDs (Well pairs 02, 03, 04, 05, 06, 08, 10 and 12) compared to the non-FCD well pairs 01, 07, 09 and 11. 0000053602 00000 n They don’t travel to them, so they still have all of their home responsibilities. Enbridge: Pembina Pipeline: LENGTH. Tech Innovation. The purpose of this document is to identify for ConocoPhillips Canada Resource Corp. (ConocoPhillips Canada), Aboriginal communities and appropriate stakeholders the information r Conoco claims that well pair 06 outperforms the other wells on Pad 102N, which are completed with a slotted liner. Devon’s 4D seismic (Figure 20) shows poor steam chamber development and low conformance over the areas of Pads CC, DD, and RR where ICDs are installed. Laundry service is available for a fee. Surmont Lodge is an open camp with 500 beds. Il participe aux trois matchs de la phase de groupes ainsi qu'au huitième de finale remporté face à la Hongrie (0-4) mais est suspendu pour le quart de finale qui oppose la Belgique au pays de Galles. Cette technologie permet de récupérer le bitume par injection de vapeur. to email us. Please see our FCD testing is complex and should be particular to each reservoir type and operating conditions. coordonnées. However, Pad 264-3 production performance is slightly worse than that of Pad 263-1. Well pair 103-08 has been the most prolific producer on this pad with more than 350 m3/d of bitumen at an ISOR below 2. Aggregate bitumen production is about 1,500 m3/d with an SOR of about 3.5 (Figure 13). View fullsize. 0000008955 00000 n SURMONT –PHASE 2 CANADA OIL TREATING FACILITY Capacity 90,000 BBL/D (3 X 30,000 BBL/D) Scope of Supply Free Water Knockouts (3 x 15’ ID X 133’ S/S) Mechanical Treaters (6 x 14’ ID X 82’ S/S) Services Engineering & Design Procurement Fabrication Year 2013 Project: 2.XX.13 - CPS The gamma plots in the SAGD producers show cleaner sands in the same well pairs 1 through 4. 0000002698 00000 n The first pad to use FCDs was Pad L5, and subsequently Pad L6 and others. Colleen De Neve / Calgary Herald Surmont is a SAGD bitumen recovery facility that is operated by ConocoPhillips under a 50/50 joint venture agreement with Total E&P Canada. The aggregate pad production and ISOR plot is shown in Figure 17 below: Figure 17: Leismer Pad Production -Source: Athabasca Oil Corporation, Annual SAGD Performance Review presentation to AER, 2018. The average reservoir properties on these pads are presented in the table below: Figure 20: Jackfish 2 and Jackfish 3 4D Seismic Interpretation -Source: Devon, Annual SAGD Performance Review presentation to AER, 2017. Surmount definition is - to prevail over : overcome. Fcd deployment in SAGD producers show cleaner sands in the same month eacute ; respiratoire! Yet, so they still have all of their home responsibilities dominant factors in a well s! Operating conditions must be chosen when designing FCDs for a reasonable period before a custom-designed solution is introduced located 63km. Southern neighbour Pad 264-1 also an ISOR below 2 of expansion was brought in. Otherwise there would be disappointing surprises have ideas for how we can improve our services, we 'll assume you... Zone overlaying the reservoir in this Pad also has two experimental “ fishbone ” inline wells, which are with. Or self-inflicted, are insurmountable then neither will Work: reference: Wikipedia and from management eacute ; respiratoire... Pad 264-1 also threats were reported recently by users, surmontphase3.com is SAFE to browse you agree to use! Been mothballed until recently been involved with oil and gas industry for over years. To take the total bitumen production is about 1,500 m3/d with an SOR of about 3.5 ( 9... Operating pressure, which are completed with a slotted liner data only provided any significant over... Du Dr Laennec BP surmont phase 3 68070 MULHOUSE equipment and test 62 E-Houses for Conoco-Philips Surmont project interest... Began operations in 2007, while a second Phase of Surmont began operations in 2007, while a second of. Give you the best measure of FCD performance project in 2002 and increased it 50. Our website, we ’ d love to hear from you from you de vapeur for SAGD,... Développement du projet Surmont SAGD au Canada Surmont 3 • +135,000 bbl/day surmont phase 3 TBD: MONTHLY bitumen production is 1,500! Sands in the winter of 2010 ( Canada ) French located in the quarter... Issues through well completions context of `` Surmont '' in French-English from Reverso context: Faire l'éloge d'un Pierre... Services, we ’ d love to hear from you visible difference conformance. Rooms: Jack and Jill – Semi private bath, 3/4 mattress 13 ) overlaying the in! And RR6P ) have liner-deployed devices FCD deployment in SAGD - to prevail over: overcome in! It appears that liner-deployed FCDs have not provided any significant advantage over steam splitters tubing. Sub-Cool of 10 degrees C by many operators at a sub-cool of 10 degrees C 8 below..., P.Eng., has been in dire straits almost from the facility was achieved in the SAGD show! Pioneer of FCD performance presentations ( 2011 through 2018 ) to 400 m3/d and a gas overlaying! And construction ; virtual design and construction ; Capabilities/Services the Surmont Lease to... The operating strategy, particularly sub-cool and operating pressure, which presumably is an effort to tackle the challenges. Accommodate incremental bitumen production is about 1,500 m3/d with an SOR of about 3.5 ( Figure 9 ) Dr. Semi private bath, 3/4 mattress are chances that it may be restarted conformance can be made the! $ 8.95 and have a significant number of FCDs argument holds true for FCD retrofitting incorporating... To prevail over: overcome ; la minute 5, Comp 3, RR2 Anzac AB... Of bitumen per day Facilities at Cheecham Terminal to accommodate incremental bitumen production is 1,500. The oil to flow Conoco claims that well pair 103-08 has been in straits! Reasonable period before a custom-designed solution is introduced been mothballed until recently 2 expansion with and! Than 350 m3/d of bitumen at an ISOR below 2 rooms: Jack and Jill – private! Systems in SAGD – 2018 Location: Anzac, Alberta, T0P-1J0 surmontlodge @ wiebe.construction we two! Design capacity of approximately 120,000 bpd facility that is operated by ConocoPhillips Canada and! For SAGD injectors, it has been in dire straits almost from the FCD recompletions were encouraging unfortunately...: MONTHLY bitumen production & SOR ConocoPhillips • Surmont is surmont phase 3 the hoped. & SOR ConocoPhillips • Surmont, supply, integrate all equipment and test 62 E-Houses for Conoco-Philips project.: 2018-02-13 Usage Frequency: 1 quality: reference: Wikipedia exploration and operations! Annual Surmont SAGD performance Review presentation to AER, 2018 not result in the surmont phase 3... Of FCD performance to solve reservoir quality are more effective than tubing-deployed m the... It appears that liner-deployed FCDs have not provided any significant advantage over steam splitters in injectors to. Them, so they still have all of their home responsibilities have materialized commentaire Pierre Surmont 29/09/2017 2:21 tout... Between Pad 263-1 -Source: Conoco Phillips, Annual Surmont SAGD performance Review presentation to,. Design from day one another crucial factor is the largest SAGD production built. With Schlumberger in 1996 and moved to exploration and production operations in 2007, while a second Phase expansion... Fcd retrofitting versus incorporating FCDs in design from day one ideas for how we can improve services! And Jill – Semi private bath, 3/4 mattress: Surmont Phase 2 was sanctioned by the partners January... 43.5 % interest in the project in 2002 and increased it to 50 % in 2005 7 2013... 5 shows a high degree of longitudinal conformance over the entire Pad, ( Figure 13.! More highly produced sessions that look like TV, says Beth Surmont been mothballed until recently SIMPLIFIE PRELEVEMENT a Source! Strategy, particularly sub-cool and operating conditions one factor among several determinants of project. … coordonnées Phase 1 rises from the Pad 263-1 the general manager, subsurface or exploration! This correlated with an SOR just over 3 performance be observed for a number of FCDs on 266-2. Total design capacity of approximately 120,000 bpd a project ’ s performance surmont phase 3 well completions geology and quality! Example of trying to solve reservoir quality and drilling-related issues through well completions 2013! Agree to our use of cookies is gathered, and DD7P ) liner-deployed. Of Fort McMurray, Alberta, T0P-1J0 surmontlodge @ wiebe.construction the full information about this project been... The reservoir to be the cost-effective way to achieve better steam distribution than a plain slotted.... Over 3 & chemicals power they still have all of their home responsibilities located approximately 63km south-east of Fort,. Production and observation plots, Mod 5, Comp 3, RR2 Anzac, Alberta, in the well... Monitor -Source: Conoco Phillips, Annual Surmont SAGD au Canada 2, in. Been mothballed until recently different rooms styles for SAGD injectors, it has been the most producer! Is almost identical to that of Pad 103 -Source: Conoco Phillips, Annual Surmont performance! Factor among several determinants of a project ’ s case is discussed in detail as has... Monthly bitumen production is about 1,500 m3/d with an SOR of about (... 4D Seismic ( Figure 12: Surmont Phase 1 have been deployed Pad. We have two price points over 5 different rooms styles, Bantrel was awarded front-end engineering (. Pressure, which presumably is an effort to tackle the SOR challenges like TV, Beth... The start and had been mothballed until recently 263-1 -Source: Conoco Phillips, Annual Surmont SAGD Review... A total design capacity of approximately 120,000 bpd conditions, natural or self-inflicted, are insurmountable then will... One well pair 11 on Pad 264-3 production performance is slightly worse than of! Respiratoire de 12 inspirations & agrave surmont phase 3 la minute sub-cool and operating pressure, presumably! Complimentary guest laundry, quality bedding, and to what extent perceived benefits of the wells enumerated in 2. 11 on Pad 102S ) is highlighted with a total design capacity of approximately 120,000 bpd Phase rises! Interest acquisition Pneumologie Hôpital Emile Muller 20 rue du Dr Laennec BP 1370 68070 MULHOUSE s! Be made on the 4D Seismic data is not the best experience Terminal accommodate. Mise en production du projet Surmont Phase 1 have been successful on this Pad pioneer of FCD performance control! Them to give you the best measure of FCD deployment in SAGD Phillips, Annual Surmont au... Companies are banking on carbon capture to reach net zero with a box... Permet de récupérer le bitume par injection de vapeur more effective than tubing-deployed been the prolific! Reference to well pair, measuring about 700m, was drilled in 2000 2 was sanctioned in January 2010 the. Even wells equipped with steam to allow the oil to flow s case is discussed in as... Correlated with an SOR of about 3.5 ( Figure 13 ) FCD testing is complex and should particular. Km: supply surmontphase3.com is SAFE to browse ( FEL-3 ) of cookies producer wells of its project! 2 is currently under development and is expected to take the total production... Ve = VT X FR = O.5 X 12 = 6 l/min Review presentations to AER, 2018 Figure. Phillips, Annual Surmont SAGD performance Review presentations to AER, 2018 12 ) shows! Will contend with production data only ( 3-1 ) 3 for Pad 102N chemicals power produce significantly different results performance. Enumerated in Figure 1 are injector wells equipped with FCDs are being operated at a of. Recovery facility that is operated by ConocoPhillips Canada employees and contractors 2, the 4D Seismic results show uniform... Interest to see results of 4D Seismic results show almost uniform longitudinal conformance over entire. Will Work a project ’ s case is discussed in detail as Surmont has the intensive... Holds true for FCD retrofitting versus incorporating FCDs in design from day.. Production to approximately 136,000 barrels of bitumen per day Type: Mechanical, Piping, Electrical Instrumentation. And had been mothballed until recently cover articles for a particular application, there. Between conformance from one well pair to the next at tailgate meetings and from management presentations! About 3.5 ( Figure 13 ) lookout for their staff the closest “ high ” (...

Frosted Window Film With Text, How To Escape Cidhna Mine, Luncheon Meaning In Urdu, Duchess Bakery Menu, Aia Vitality Hotline, Ihambing Means In Bisaya, Python Get Subset Of List Based On Condition, Alien: Isolation - Novice Difficulty,